
Floor Standing Vanity with Basin 800mm
800mm floor standing vanity with mirror cabinet, larger aviation board on four legs, centered 700mm mirror and side shelves; MOQ 100, FOB Guangzhou.
View productThis page is written for importers, distributors and main contractors who are shortlisting an aluminum glass washroom door supplier and need to know what the order actually contains before a purchase order goes out. Model HB2330 is a hinged interior door with an aluminum frame and a glass panel, quoted at $25.00–$100.00 with an 800-set minimum and a 10–15 day lead time. Use the sections below to plan wholesale aluminum washroom doors across hotel, apartment or commercial restroom projects, from configuration choices through pre-shipment inspection.
Order-line baseline
One model, one construction. Establish the physical build first, because every commercial question later in this guide refers back to these details.
Why the build matters for a buyer: because the glass sits inside the frame and the leaf carries no wood-based core, the door does not rely on sealing every cut edge to survive a wet room. The geometric black line across the glass is a design detail, not a structural element — treat it as an optional visual and not as part of the performance specification.
Commercial frame
Three numbers are published for HB2330. Everything else in the commercial conversation has to be settled in writing with your supplier.
| Item | Stated on the product page | What your quote must confirm |
|---|---|---|
| Unit price | $25.00 – $100.00 | Which glass option, frame colour, hardware and packing sit inside your band |
| Minimum order | 800 Sets / 800 PCs | Whether the 800 sets run as one configuration or split across colours and glass types |
| Lead time | 10–15 Days (indicative) | When the clock starts — sample approval, deposit or PO date — plus documentation time |
| Customization | OEM / ODM service offered | What is in scope for your brand, and how it affects MOQ or lead time |
Reading the price band: a single model quoted across a $25.00–$100.00 range is telling you the spread comes from configuration, not from model choice. Glass type, frame colour, hardware, export packing and how the order is split across lines are the levers worth arguing over in the quotation stage — not the headline number.
Building the order lines
Each of these choices creates a separate order line inside the 800-set run. Decide them before you ask for a price, not after.
All three glass options are listed for this door. Frosted controls visibility, fluted adds a textured screen while still transmitting daylight, tempered is the option to discuss where impact resistance is specified.
Black, white, gray, coffee and champagne (golden). Five is a genuine range rather than a single sample colour, so a mixed-colour project is a planning exercise, not a special request.
The photographed sample carries a matte face on frame and handle. A matte surface hides fingermarks and dried water spots better than a high-gloss face in daily washroom use.
A lever handle is operated with a downward push, which the product page positions as easier with a wet or occupied hand than a round knob.
Side-hung construction with an aluminum frame and a glass panel seated inside the frame. No wood-based core, so the leaf is not dependent on edge sealing.
The sample shows a black line pattern across the glass. It is a decorative detail and can be treated as a design option rather than a performance feature.
Inspection criteria
Six points that separate an acceptable HB2330 batch from a batch you will be reworking on site. Use them as pass/fail criteria at sample approval and again at pre-shipment.
Pass: corners meet with no step or gap, and the door face reads as one continuous line. Fail: visible offset at any corner.
Pass: the panel sits within the frame rebate and keeps the leaf rigid when pushed. Fail: a panel applied to the face instead of set into the frame.
Pass: every leaf swings freely, the lever returns cleanly and there is no play at the hinge. Fail: drop or bind at the hinge, loose lever.
Pass: no wood-based core in the leaf, so moisture absorption and cut-edge sealing are not the failure mode. Fail: any timber-based infill.
Pass: the glass-to-frame joint and the fit of the leaf against the opening are both closed. Fail: open gaps at either interface.
Pass: frame corners, frame faces and glass are individually protected and each set is labelled for split delivery. Fail: sets loose in a crate without corner protection.
Risk reduction
An 800-set minimum is a hard commitment. Work through these four steps before that commitment is made.
Sample and trial-order terms are not published on the product page, so ask directly. Get the answer in writing alongside your quotation request.
These are the three choices that move both the price band and the appearance of the installed door. Sign off all three on a physical sample.
The page states an OEM/ODM service is offered. Fix in writing what changes for your brand, what stays standard, and how that affects the 800-set minimum.
Keep the approved sample and its signed specification as the benchmark for the pre-shipment inspection instead of relying on a written description alone.
A 10–15 day indicative lead time is short, which is useful — but it also means a production error surfaces close to the shipment date. Approving glass type, frame colour and hardware on a sample first keeps the corrected version inside the timeline instead of after it.
If a sample is not offered, ask for a trial quantity or a pre-production approval photo set of the first finished leaf, and make that a written condition of the PO.
Sequence and handoffs
The published 10–15 day lead time is indicative. Read it against this sequence so you know which handoff starts the clock and which ones sit outside it.
Quantity, glass type, frame colour, hardware and destination fixed in one document.
Sample or photographic sign-off, if offered, before any production slot is booked.
Order lines, price band, packing instructions and delivery terms confirmed in writing.
Frame, glass, handle and finish built to the approved configuration.
Vetting checklist applied, then sets packed and labelled for export.
Indicative lead time, followed by export documentation and shipment handover.
Scenario to specification
The same model serves four very different buying situations. Each one below pairs a project scenario with a confirmed product fact and the decision it should trigger.
Product fact: five frame colours are produced and three glass options are listed, inside a single 800-set run.
Buyer decision: standardise one glass and one frame colour for standard floors, and reserve champagne (golden) frames or patterned glass for executive floors — but confirm the split terms before quoting your client.
Product fact: the glass panel lets daylight from a bedroom or hallway reach the washroom, and frosted glass is listed as an order option.
Buyer decision: specify frosted glass where full visual privacy is required and fluted glass where daylight should still pass through — and hold one choice per apartment type.
Product fact: the photographed sample uses a matte black frame and handle with a geometric black line across the glass.
Buyer decision: treat the line pattern as a design upgrade and confirm matte rather than gloss, since a matte face hides fingermarks and dried water spots better.
Product fact: tempered glass is offered, the leaf has no wood-based core, and the hardware is a lever handle.
Buyer decision: select tempered glass where impact resistance is specified, keep the lever handle for high-traffic openings, and put the two sealing points on the site handover checklist.
One complete brief shortens the quotation cycle and reduces the chance of a price that has to be revised later. Include these six points in your first message:
A complete reply should return the unit price inside the $25.00–$100.00 band for your chosen configuration, the MOQ confirmation for a split or single order line, and an indicative 10–15 day lead time with the start date defined.
Ask for the OEM/ODM scope in the same reply if you are buying under your own brand.
Review the product details, images, and specifications presented on the official product page.
Use the application and use-case information published on the official product page.
Confirm the specifications and options listed for the exact product variant before placing an order.
Check the official product page or ask the supplier about options shown for the selected product.
Use the official contact or inquiry path provided on the site.
Include the product page, intended use, required quantity, and any specifications you need the supplier to review.